Corporate guide · Water purifiers
Office Water Purifier Installation in Singapore: Corporate Checklist
An office enquiry needs more than a preferred model. Corporate applicant details, two clearly defined installation points and useful site photos help reduce avoidable visits and surprises.
Last updated: 2026-09-02

1. How office installation differs from home installation
An office may require corporate eligibility review, building or landlord approval, facilities coordination and installation planning around staff access. With two units, each location needs its own water, power, space and access review.
2. Information needed for a corporate enquiry
Availability and contract terms can vary by product, model and the result of the corporate assessment.
- Company name
- Contact person’s name
- Contact number
- Preferred model
- Required quantity
3. What to check at each installation point
- Where each unit will sit
- Clear width, depth and height
- Distance from water supply and power
- Door, cabinet and maintenance access
- Whether additional plumbing or electrical work may be needed
4. Pre-installation photo checklist
Photos can reduce the chance of an unnecessary site visit, but they do not guarantee installation. The installer confirms final feasibility on site.
- A wide photo of the pantry or office area
- Front and side views of the proposed position
- Width, depth and height measurements
- A photo with the under-sink cabinet fully open
- A clear view of the water valve and connecting hose
- A photo of the nearest power socket
- A short video showing the structure above and below the sink
- Confirmation of any building or landlord approval requirement
5. Extra considerations for two purifiers
- Label location A and location B in every photo.
- Confirm whether both units can share facilities or need separate routes.
- Plan delivery access, installation timing and a corporate contact on site.
- Check the distance to water and power for each unit independently.
6. WD518AN two-unit discount example
This is a currently confirmed example for two WD518AN units. It is not automatic for every model or corporate applicant; LG policy and eligibility at application determine the final offer.
7. From enquiry to installation
- 1Provide company, contact, model and quantity details.
- 2Share labelled photos, measurements and the short sink video.
- 3Confirm building or landlord requirements.
- 4Ask LG to confirm application eligibility and available contract terms.
- 5Arrange the site visit or installation assessment if needed.
- 6Installer confirms feasibility and completes approved installation.
FAQ
Frequently asked questions
Do photos guarantee installation?
No. They support preliminary review; the installer makes the final decision at the site.
Is the WD518AN 5% discount automatic?
No. It is a currently confirmed two-unit example, subject to LG policy and applicant eligibility when applying.
Does a company need landlord or building approval?
It depends on the premises and work required. Confirm the building or lease requirements before installation.
Can two units be installed on the same day?
Possibly, subject to application approval, site readiness, installer scheduling and the conditions at both locations.